A workshop’s jobs database has a customer table, a parts table, and a report that prints tomorrow’s pick list. The replacement can store every table and still leave the morning team waiting for its printout. The risk sits in the jobs the old tool performs, especially the ones people have stopped thinking about.
Spend one day with the people who open the file, edit it, and send something based on it.
Look below the rows people see
- Forms and reports Job entry and the printed pick list
- Rules and queries Reserved stock and jobs due tomorrow
- Tables and links Parts, jobs, and an external stock file
- Operating routine The morning handoff to the storekeeper
Follow one output back to its sources
Ask the storekeeper to print tomorrow’s list from start to finish. Record which file they open, any linked files they refresh, and the cutoff they use. Then look through saved queries, hidden sheets, named ranges, and macros behind that result. Highlight formulas people override during stock shortages. Those overrides often reveal a decision the new system will need a home for.
Keep a sample input and output for each critical job. Document the date and local settings if they change the result.
Move enough of the workflow to prove it works
Start with reading active jobs and drafting the pick list. Give the new system the latest approved stock extract and compare the result against the old printout. Suppose it includes a job that was canceled after the export. Trace where the cancellation was entered and agree how the new list should reflect the cutoff. Importing more history will leave that problem in place.
Keep a single place for staff to edit assignments during the trial. Give them a way to record mismatches while they continue morning work.
Before cutting over, ask a new operator to follow the written routine and hand the list to the storekeeper. If they still need a shortcut known only to the administrator, add it to the supported workflow and run the handoff again.
Retire the file with an owner and a date
After the storekeeper and workshop lead accept the new routine, freeze the old copy and label it with the cutoff. Keep an accessible archive where policy permits, with an owner for questions about historical records. Remove the old shortcuts from the work instructions so a new starter learns the active process.